6.
A clay layer 3 m deep is sandwiched by a pervious material. The soil reaches 90% consolidation in 3 years. At another site, the same clay layer is bounded by impervious boundary at the bottom and sand at the top. What is the time taken by this layer to reach 90% settlement ?
Discussion:
2 comments Page 1 of 1.
Amit Singh said:
5 years ago
Tv = Cvt/d^2 > t = d^2.
t2= t1(d2/d1)^2 = 3(d/d/2)^2 = 12.
t2= t1(d2/d1)^2 = 3(d/d/2)^2 = 12.
Abdelhamid.hidar said:
8 years ago
t= 3 years * (3m/1.5m)^2 = 12 year note we chose 1.5 m because we have drainage up and down for sn layer.