Discussion Forum : UPSC Civil Service Exam Questions - Section 26 (Q.No. 50)
50.
The correct sequence, in the direction of the flow of water for installations in the hydro-power plant is
Discussion:
5 comments Page 1 of 1.
Seshank said:
4 years ago
Option C is correct.
In the question, the sequence in the direction of flow is asked.
Reservoir - penstock - turbine, when the load is reduced the rejected flow of water is back into the surge tank.
This is the correct sequence of the flow of water.
In the question, the sequence in the direction of flow is asked.
Reservoir - penstock - turbine, when the load is reduced the rejected flow of water is back into the surge tank.
This is the correct sequence of the flow of water.
Sadashiva said:
7 years ago
Explanation:
Option (B) is correct Reservoir " Penstock " Surge tank " Turbine The surge tank is open to atmosphere and connected to penstock. It should be as close as possible to the power house (turbine).
Option (B) is correct Reservoir " Penstock " Surge tank " Turbine The surge tank is open to atmosphere and connected to penstock. It should be as close as possible to the power house (turbine).
SHOAIB Ahmad said:
8 years ago
Reservoir -penstock-surgetank-turbine.
Kamal said:
8 years ago
In Hydroelectric plant:
Reservoir- Surge Tank- penstock- turbine.
Reservoir- Surge Tank- penstock- turbine.
AMRIT said:
8 years ago
In a hydro project, Reservoir - INTAKE - D TANK - HRT - SURGE TANK- PENSTOKE - TURBINE - TRT.