14.
A fill having a volume of 150, 000 cm is to be constructed at a void ratio of 0.8. The borrow pit soil has a void ratio of 1.4. The volume of soil required (in cubic metres) to be excavated from the borrow pit will be
1, 87, 500
2, 00, 000
2, 10, 000
2, 50, 000
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
2 comments Page 1 of 1.

Paul said:   4 years ago
N = 1/(1+e) & vv/vs.
Now borrow pit n =0.416,

Fill n=1/1+e= 1/(1+0.8) = 0.5555,
Now fill. Vv=0.5555 * V.
V=150000 ;.
Vv= 0.55555 * 150000 = 83,333,

In fill. N=Vv/V.
V = Vv/n = 83,333/0.416 = 199,999 = 200,000.

Chhaya said:   8 years ago
I think the answer is A.