Civil Engineering - Surveying - Discussion
Discussion Forum : Surveying - Section 5 (Q.No. 20)
20.
The line of collimation method of reduction of levels, does not provide a check on
Discussion:
2 comments Page 1 of 1.
Anup kumar Tharu said:
4 years ago
Intermediate sight means?
Kenei Rio said:
3 years ago
@Anup Kumar Tharu.
The ranging rods placed between the foresight and the back sight or in the centre as in simple terms.
The ranging rods placed between the foresight and the back sight or in the centre as in simple terms.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers