Civil Engineering - Surveying - Discussion

Discussion Forum : Surveying - Section 4 (Q.No. 11)
11.
In levelling operation,
The first sight on any change point is a back sight
The second sight on any change point is a fore sight
The line commences with a fore sight and closes with a back sight
The line commences with a back sight and closes with a foresight.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
14 comments Page 2 of 2.

Dpk said:   7 years ago
According to me, 124 are correct, and 3rd is wrong.

Kalpesh said:   7 years ago
According to me, A and D both are right.

Shakeel said:   7 years ago
1, 2, and 4 is right.

Fiza said:   6 years ago
Thank you @Krishna.


Post your comments here:

Your comments will be displayed after verification.