Civil Engineering - Surveying - Discussion

Discussion Forum : Surveying - Section 1 (Q.No. 9)
9.
In chain surveying tie lines are primarily provided
to check the accuracy of the survey
to take offsets for detail survey
to avoid long offsets from chain lines
to increase the number of chain lines.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
60 comments Page 3 of 6.

It's me said:   7 years ago
Tie lines are provided to locate the interior details which far away from the main survey line.

Dabig said:   6 years ago
Tie line is mainly used for the joining of subsidiary lines or two offset lines. Check lines are used to check the accuracy of the work.

Chiku said:   6 years ago
Thanks all for explaining.

Ashok said:   6 years ago
Thanks everyone for explaining.

Arvind said:   6 years ago
Option B and C both are correct. Tie lines is used to avoid long offset and to locate interior details but we have to take offset from tie line to object to locate interior details.

Saurabh said:   6 years ago
Tie line is used to collect information about near by object.

Risab pant said:   6 years ago
The line which is used for checking the accuracy of work is Tie line.

Abhishek Nayak said:   6 years ago
Option B is correct.

Pramit Samanta said:   5 years ago
Right @Jamshaid Ahmed.

D Bharath said:   3 years ago
Tie lines is to mark the points.


Post your comments here:

Your comments will be displayed after verification.