In chain surveying tie lines are primarily provided
to check the accuracy of the survey
to take offsets for detail survey
to avoid long offsets from chain lines
to increase the number of chain lines.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
60 comments Page 1 of 6.

Jamshaid ahmed said:   4 years ago
Main line:line joining two main survey stations.
Tie line is used for surveying detail.
Check line is used for checking the work.
Base line :longest chain line.
(7)

Sheetal said:   4 years ago
Tie lines also called as check lines, are Used to check the accuracy of survey work.
(3)

Sukhwinder said:   5 years ago
Option B is the correct answer.
(2)

Mansi Patel said:   4 years ago
Tie line is a line drawn to collect information of details of objects nearly.
(1)

Pkota said:   5 years ago
Option B should be the correct answer.
(1)

Mithlesh said:   5 years ago
I think Option B is correct.
(1)

Pramit Samanta said:   5 years ago
The tie line is to locate details, so B is the right answer.
(1)

Dinesh sunar said:   6 years ago
The offset having their length more than 15m is called long offset so avoid the long offset to reduce error in chain lines.

Ashok said:   6 years ago
Thanks everyone for explaining.

Avtarchaudhary said:   6 years ago
Option B is the right answer.