In chain surveying tie lines are primarily provided
to check the accuracy of the survey
to take offsets for detail survey
to avoid long offsets from chain lines
to increase the number of chain lines.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
60 comments Page 2 of 6.

Saugat Oli said:   7 years ago
Given answer is correct.

Tie lines are run to avoid long offset whereas check line are run for better accuracy.

Aswathy said:   7 years ago
Tie lines are line joining some fixed points on the main survey lines. Used to check the accuracy of framework.

Prateek said:   7 years ago
It's correct, the tie lines are used to avoid long offsets whereas check lines are used to check accuracy.

Vivek said:   7 years ago
Answer B is correct.

Check line: check the accuracy of work.

Tie line:take the detail of nearby object.

It's me said:   6 years ago
Tie lines are provided to locate the interior details which far away from the main survey line.

Sachin said:   6 years ago
B is the right option.

Tie lines are type of offset which are used for inner details of area.

Nikitesh said:   1 decade ago
Tie line is the line is basically used for plot offset accurately & avoiding long offset.

Indhu said:   1 decade ago
Tie line is a line which joins subsidiary station or tie station. It is used for accuracy.

Mantu said:   10 years ago
Tie lines are mainly taken to fix the directions of adjacent sides of chain survey map.

Duraisamy said:   8 years ago
Main line.

Offset line equal length to the main line.

Tie mean avoid long distance.