Civil Engineering - Surveying
Exercise : Surveying - Section 5
6.
The chaining on sloping ground is
7.
Profile levelling is usually done for determining
8.
The conventional sign shown in below figure represents a


9.
For indirect ranging, number of ranging rods required, is
10.
Correction per chain length of 100 links along a slope having a rise of 1 unit in n horizontal units, is
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers