Civil Engineering - Surveying

6.
The chaining on sloping ground is
easier along the falling gradient
easier along the up gradient
equally convenient along falling as well as up gradient
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

7.
Profile levelling is usually done for determining
contours of an area
capacity of a reservoir
elevations along a straight line
boundaries of property
Answer: Option
Explanation:
No answer description is available. Let's discuss.

8.
The conventional sign shown in below figure represents a
road bridge
railway bridge
canal bridge
aquaduct.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

9.
For indirect ranging, number of ranging rods required, is
1
2
3
4
5
Answer: Option
Explanation:
No answer description is available. Let's discuss.

10.
Correction per chain length of 100 links along a slope having a rise of 1 unit in n horizontal units, is
100 n2
.
Answer: Option
Explanation:
No answer description is available. Let's discuss.