Civil Engineering - Surveying
Exercise : Surveying - Section 4
31.
Greater accuracy in linear measurements, is obtained by
32.
From any point on the surface with a given inclination
33.
Angles to a given pivot station observed from a number of traverse stations when plotted, the lines to the pivot station intersect at a common point
34.
Reduced bearing of a line is an angle between
35.
While measuring with a metallic tape of 30 m length pull should be applied
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers