Civil Engineering - Structural Design Specifications - Discussion

Discussion Forum : Structural Design Specifications - Section 1 (Q.No. 12)
12.
Moist curing of the exposed surfaces of concrete is done at least for
3 days
5 days
7 days
14 days
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
3 comments Page 1 of 1.

Fakhar Naveed said:   2 months ago
Yes, Under normal circumstances, the beam soffits may be removed after 7 days.

Sonu (Guruji) said:   11 months ago
@Abhinav.

Right.

Abhinav Raj said:   2 years ago
As per clause 13.5.1 of IS 456:2000.

OPC = 7 days.

If mineral admixture or blended cement are used = 10 days.
If the concrete is exposed to dry and hot weather conditions, OPC = 10 days.
If concrete exposed to dry and hot weather conditions and mineral admixture or blended cement are used = 14 days.