Civil Engineering - Structural Design Specifications - Discussion
Discussion Forum : Structural Design Specifications - Section 1 (Q.No. 12)
12.
Moist curing of the exposed surfaces of concrete is done at least for
Discussion:
3 comments Page 1 of 1.
Fakhar Naveed said:
2 months ago
Yes, Under normal circumstances, the beam soffits may be removed after 7 days.
Sonu (Guruji) said:
11 months ago
@Abhinav.
Right.
Right.
Abhinav Raj said:
2 years ago
As per clause 13.5.1 of IS 456:2000.
OPC = 7 days.
If mineral admixture or blended cement are used = 10 days.
If the concrete is exposed to dry and hot weather conditions, OPC = 10 days.
If concrete exposed to dry and hot weather conditions and mineral admixture or blended cement are used = 14 days.
OPC = 7 days.
If mineral admixture or blended cement are used = 10 days.
If the concrete is exposed to dry and hot weather conditions, OPC = 10 days.
If concrete exposed to dry and hot weather conditions and mineral admixture or blended cement are used = 14 days.