Civil Engineering - Steel Structure Design - Discussion

Discussion Forum : Steel Structure Design - Section 3 (Q.No. 7)
7.
If d is the clear depth of a plate girder, t is the minimum required thickness of the web, C is the maximum clear distance between vertical stiffeners, the moment of inertia of a pair of stiffeners about the centre line of the web, is
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
1 comments Page 1 of 1.

Garry said:   8 years ago
It can simply be checked by dimensional analysis.