Civil Engineering - Steel Structure Design - Discussion

7. 

If d is the clear depth of a plate girder, t is the minimum required thickness of the web, C is the maximum clear distance between vertical stiffeners, the moment of inertia of a pair of stiffeners about the centre line of the web, is

[A].
[B].
[C].
[D].

Answer: Option A

Explanation:

No answer description available for this question.

Garry said: (Jan 18, 2018)  
It can simply be checked by dimensional analysis.

Post your comments here:

Name *:

Email   : (optional)

» Your comments will be displayed only after manual approval.