Civil Engineering - Railways
Exercise : Railways - Section 4
- Railways - Section 1
- Railways - Section 2
- Railways - Section 3
- Railways - Section 4
6.
For inspection and packing of ballast, each pot sleeper is provided with
7.
Each block of a two-block concrete sleeper is
8.
The effective bearing area of all types of sleepers, is
9.
For points and crossings, maximum size of ballast, is
10.
The main function of sleepers, is
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers