21.
Track construction involves preparation of
22.
In permanent way, ballast
23.
The lengths of the standard crossings in India for Broad gauge and Metre gauge tracks is same for
24.
If w is width of sleepers, s is sleeper spacing and d is depth of ballast then
25.
On either side of the centre line of rails, a cant of 1 in 20 in the sleeper is provided for a distance of