Civil Engineering - Railways

Exercise :: Railways - Section 3

21. 

Track construction involves preparation of

A. subgrade
B. plate laying
C. ballasting
D. all the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

22. 

In permanent way, ballast

A. transfers load from sleepers to the formation
B. provides an elastic bed to the track
C. provides a drainage of track
D. all the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

23. 

The lengths of the standard crossings in India for Broad gauge and Metre gauge tracks is same for

A. 1 in B.G. and, in 12 M.G.
B. 1 in 12 B.G. and, 1 in 16 M.G.
C. 1 in 12 B.G. and 1 in M.G.
D. 1 in 16 B.G. and 1 in 12 M.G.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

24. 

If w is width of sleepers, s is sleeper spacing and d is depth of ballast then

A.
B.
C.
D.
E.

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

25. 

On either side of the centre line of rails, a cant of 1 in 20 in the sleeper is provided for a distance of

A. 150 mm
B. 165 mm
C. 175 mm
D. 185 mm

Answer: Option C

Explanation: