16.
If S is cant deficiency in centimetres and V is maximum permissible speed in km p.h,, the maximum length of transition curves, is
Answer: Option
Explanation:
No answer description is available. Let's discuss.

17.
Indian Railways detects the rail flow by
Mitsubish Rail flow dector
Soni Rail flow dector
Audi-gauge Rail flow detector
Kraut Kramer Rail flow detector.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

18.
The rail section which is not used on Indian Broad Gauge tracks, is
35 R
40 R
45 R
55 R
Answer: Option
Explanation:
No answer description is available. Let's discuss.

19.
Ballast packed below and around the sleepers to transfer the load from sleepers to formation, generally consists of
broken stones
gravels
moorum
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

20.
A wing rail is renewed or reconditioned if its maximum vertical wear is
9.5 m
7.5 m
5.5 m
5.0 m
Answer: Option
Explanation: