Civil Engineering - Irrigation - Discussion

Discussion Forum : Irrigation - Section 1 (Q.No. 48)
48.
Pick up the incorrect statement from the following
A bank in the cross-section of a canal is provided on the right
A bank in the cross-section of a canal is provided on the left
A 'dowla' in the cross-section of a canal is provided on the left
None of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
10 comments Page 1 of 1.

Muhammad Hashim said:   4 years ago
Usually in cross-section of road, on left side dowels and service road is provided. While on the other side i.e. on the right side canal bank is mentioned. Search " canal section in filling".

So, Option B is the right one.
(1)

Ajay Kumar Yadav said:   4 years ago
I too think D is the correct answer.

Amir hameed said:   5 years ago
Yes, option D is correct.

Sanku said:   5 years ago
None of these is the correct answer.
(1)

Akash said:   6 years ago
The answer is None of these.

Basu said:   7 years ago
The Answer Should be None of these.

Sunny said:   7 years ago
Agree @Ravi.

Please anyone clarify it.

Apurba Mukherjee said:   8 years ago
The primary purpose of the bank is to retain water so the bank is provided in both side and dowlas as a measure of safety in driving are provided along the banks it also helps in preventing slope erosion due to rains, etc.
(1)

Ravi said:   8 years ago
How? Bank is provided on the both side I think.

Rajeshkumar said:   8 years ago
Explain it.

Post your comments here:

Your comments will be displayed after verification.