Pick up the correct sequence of the part of a canal system from the following

A. Head work-distributary-branch canal-minor
B. Head works-main canal-branch canal-dis-tributary-minor
C. Head works-main canal-branch canal-minor-distributary
D. Heads works-branch canal-main canal distributary, minor.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

37. 

A counter berm is

A. a horizontal benching provided on the inside slope
B. a horizontal benching provided on the outside slope
C. a vertical benching provided on the outer edge of the bank
D. a vertical benching provided on the inner edge of the bank.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

38. 

Pick up the correct statement from the following:

A. Water table generally follows the ground surface above it with a few exceptions
B. Static level of water in an open well indicates the position of the water table
C. Saturated pores of a soil in the capillary zone above water table have negative pressure
D. At water table, hydrostatic pressure is zero
E. All the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.

39. 

For diversion of flood water of rivers, the type of canal constructed, is

A. ridge canal
B. perennial canal
C. inundation canal
D. canal.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

40. 

To control the silt entry into a distributary at head regulator, King's vanes are provided which are the walls

A. of R.C.C. or steel plate 8 cm thick
B. of height l/3rd to l/4th the depth of water in the main canal
C. spaced at interval of times their heights
D. extending about one metre beyond a line drawn at an inclination of 2 : 1 to the axis of main canal
E. all the above.

Answer: Option E

Explanation:

No answer description available for this question. Let us discuss.