36.
Pick up the correct sequence of the part of a canal system from the following
37.
A counter berm is
38.
Pick up the correct statement from the following:
39.
For diversion of flood water of rivers, the type of canal constructed, is
40.
To control the silt entry into a distributary at head regulator, King's vanes are provided which are the walls