Civil Engineering - Highway Engineering - Discussion

15. 

Traffic surveys are carried out

[A]. to know the type of traffic
[B]. to determine the facilities to traffic regulations
[C]. to design proper drainage system
[D]. all the above.

Answer: Option D

Explanation:

No answer description available for this question.

Bindiya said: (Jun 7, 2014)  
How Traffic Survey can be used in Designing of drainage System?

Avinash said: (Jan 27, 2015)  
Obviously all things are to be surveyed, nothing is needed to discuss.

Sravanthi said: (Feb 24, 2015)  
Why traffic survey is required to design drainage system?

Jundel said: (Jul 30, 2015)  
Problems in the drainage system may affect the traffic conditions.

Ravikumar said: (Oct 7, 2015)  
Wrong answer, in traffic study deals only the volume of traffic in peak hours and type of vehicles etc.

Edgar Muhangi said: (Feb 2, 2016)  
I thought traffic survey is for determining the volume and type of vehicles that use the facility i.e. the road.

My best option would be A.

Makush said: (Feb 27, 2017)  
According to me, A and B might be the answers because determining the maximum load could help to traffic regulation in terms of avoiding overloading.

Makush said: (Feb 27, 2017)  
In other the types of vehicle may be considered in determining cross slopes or superelevation, which will affect surface water characteristics.

Haroon said: (Mar 5, 2018)  
Drainage is also issue eg. Hyderabad.

Post your comments here:

Name *:

Email   : (optional)

» Your comments will be displayed only after manual approval.