24.
If d is the economic designed depth of a slab, the thickness of the cement concrete pavement slab at interior, is kept
Discussion:
3 comments Page 1 of 1.
Hemanth said:
7 years ago
@Madhu.
In cement concrete and high bituminous surface, 2% of camber in HEAVY rain and 1.7% camber in LIGHT rain is provided.
In cement concrete and high bituminous surface, 2% of camber in HEAVY rain and 1.7% camber in LIGHT rain is provided.
Samm said:
9 years ago
For camber in the central portion, conc height should be more than the outer portion. Please explain.
Madhu said:
8 years ago
In concrete road camber is not provided @Samm.