Civil Engineering - Highway Engineering - Discussion
Discussion Forum : Highway Engineering - Section 1 (Q.No. 2)
2.
The minimum value of camber provided for thin bituminous surface hill roads, is
Discussion:
45 comments Page 2 of 5.
Ayaz Ahmed said:
8 years ago
Generally 2.5% in hill areas.
Datta Wasmatkar said:
8 years ago
For bituman road 3% and wbm 4%.
Ali Gul said:
8 years ago
Exactly, 2.3 for hill road.
Anil said:
8 years ago
Thin bitumen 2.5.
Shivam jaiswal said:
8 years ago
Generally, we provide 2.5% normal camber in the bituminous pavement and 3% in a concrete road.
Ayebare Junior said:
8 years ago
Generally, for thin bituminous pavements, the minimum camber should be 2.5% to cater for drainage of the surface runoffs.
Srimanta haldar said:
8 years ago
In the hilly area where we can provide a minimum of 2.5% camber,& maximum of 10% camber.
Although 7% is max required for the road as per ISI. But in hill road, we can avoid as per position.
Although 7% is max required for the road as per ISI. But in hill road, we can avoid as per position.
Kona said:
7 years ago
Hilly mean heavy rainfall area.
Ajay said:
7 years ago
For camber.
In CC road it is 1 in 50.
Thin bitumen 1 in 40.
Gravel 1 in 33.
Earthen 1 in 25.
In CC road it is 1 in 50.
Thin bitumen 1 in 40.
Gravel 1 in 33.
Earthen 1 in 25.
Jeetendra said:
7 years ago
Camber for the thin bituminous surface.
In high rainfall - 2.5% or 1 in 40.
In light rainfall -2% or 1 in 40.
In high rainfall - 2.5% or 1 in 40.
In light rainfall -2% or 1 in 40.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers