39.
Pick up the correct statement from the following:
Detailed survey is carried out for a strip of land about 15 m on either side of the trace cut along straight portions
Detailed survey is carried out for a strip of land about 30 m at sharp curves
Levels are taken along the trace cut at an interval of 20 m
Contour interval is generally adopted at 2 metres vertical interval
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.