Civil Engineering - Highway Engineering - Discussion

Discussion Forum : Highway Engineering - Section 5 (Q.No. 40)
40.
The G.T. road from Lahore to Calcutta in undivided India, was constructed during
3495-3500 BC
265-270 BC
1540-1545 AD
1440-1450
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
7 comments Page 1 of 1.

Garry said:   8 years ago
According to me, it should be from 1486 to 1545.

YOGESH said:   7 years ago
Option B is correct I think.

Lokesh said:   7 years ago
The answer is B during CHANDRA GUPTA MOURYA period.

Param said:   6 years ago
Answer is correct.

It's Constructed during the time of Shershah Suri (1540-1545AD).

HARSHA N C said:   5 years ago
Right answer thanks @Param.

Ajay Sharma said:   5 years ago
It's constructed by Mourya before 320 bc and later get repaired by Sher Shah Suri Mughals and by Britishers. So the right answer should be B.

Ajay Sharma said:   5 years ago
It's constructed by Mourya before 320 bc and later get repaired by Sher Shah Suri Mughals and by Britishers. So the right answer should be B.

Post your comments here:

Your comments will be displayed after verification.