34.
The proposed dam shown in the below figure is 90 m long and coefficient of permeability of the soil is 0.0013 mm/second. The quantity of water (m3) that will be lost per day, by seepage is (rounded to the nearest number):


Discussion:
7 comments Page 1 of 1.
SUDESH said:
4 years ago
57 is the correct answer.
Ajay said:
5 years ago
@Prathik.
nf( no of flow fields) = no of flow lines -1.
and nd( no of equipotential drop)= no of equipotential line -1.
So, the correct answer should be 57.
nf( no of flow fields) = no of flow lines -1.
and nd( no of equipotential drop)= no of equipotential line -1.
So, the correct answer should be 57.
Ankita said:
5 years ago
I think the no of flow lines -1.
And no of potential drop lines -1.
And no of potential drop lines -1.
Ojaswi said:
7 years ago
The correct answer is 61.
I agree with the given answer.
I agree with the given answer.
Prathik said:
8 years ago
The number 61 only is the right answer.
nf=6 (no. of flowlines +1).
nd=9 (no of potential drop lines +1).
nf=6 (no. of flowlines +1).
nd=9 (no of potential drop lines +1).
Chhaya said:
8 years ago
Yes, correct @Raghav.
Raghav said:
9 years ago
Correct answer is 57.
Because q = (kHLnf)/nd
q = 0.0013 * 10^(-3) *9 * 90 * 5/(8 * 86400),
q= 56.87m^3/day.
Because q = (kHLnf)/nd
q = 0.0013 * 10^(-3) *9 * 90 * 5/(8 * 86400),
q= 56.87m^3/day.