Civil Engineering - Estimating and Costing - Discussion

Discussion Forum : Estimating and Costing - Section 1 (Q.No. 30)
30.
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
Mid-section formula
Trapezoidal formula
Prismoidal formula
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.