Civil Engineering - Engineering Economy - Discussion

Discussion Forum : Engineering Economy - Section 1 (Q.No. 11)
11.
The estimate based on a detailed quantity survey and furnishes the most accurate and reliable estimate possible is known as
Conceptual estimate
Definitive estimate
Probabilistic estimate
None of these
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
1 comments Page 1 of 1.

Gee said:   1 decade ago
A definitive estimate is prepared from well defined data, specifications, drawings, etc. This category covers all estimate ranges from a minimum to maximum definitive type. These estimates are used for bid proposals, bid evaluations, contract changes, extra work, legal claims, permit and government approvals. Other terms associated with a Definitive Estimate include check, lump sum, tender, post contract changes. Etc.

Post your comments here:

Your comments will be displayed after verification.