2. 

Which method is adopted to develop an approximate or conceptual estimate for perimeter works for buildings from the following:

[A]. Base unit method
[B]. Cost per function method
[C]. Cost per square metre method
[D]. Cost per cubic metre method
[E]. Cost per linear metre method

Answer: Option E

Explanation:

No answer description available for this question.