3. 

Pick up the correct method adopted for developing the approximate or conceptual estimates from the following :

[A]. Base unit method
[B]. Cost per function method
[C]. Cost per square metre
[D]. Cost per linear unit
[E]. All of these

Answer: Option E

Explanation:

No answer description available for this question.