19. 

The construction manager uses the estimate of the project

[A]. to tell the owner of the project to take his/her financial decision.
[B]. to advise the architect/engineer regarding design cost parameter especially in value engineering analysis.
[C]. to develop bids on the project.
[D]. to control the project during its construction.
[E]. All of these

Answer: Option E

Explanation:

No answer description available for this question.