Civil Engineering - Concrete Technology - Discussion

Discussion Forum : Concrete Technology - Section 1 (Q.No. 21)
21.
Construction joints are provided
where B.M. and S.F. are small
where the member is supported by other member
at 18 m apart in huge structures
in concrete wall at sill level of windows
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
11 comments Page 2 of 2.

Ram Chaudhary said:   7 years ago
Because the place where bm and shear force is minimum there will be less displacement to the structure which meets with the point that we can easily provide construction joint in that place.


Post your comments here:

Your comments will be displayed after verification.