Civil Engineering - Building Materials - Discussion
Discussion Forum : Building Materials - Section 3 (Q.No. 26)
26.
The normal curing period for lime mortar, is:
Discussion:
10 comments Page 1 of 1.
Garry said:
8 years ago
Only for foundation not for general use.
Sahebaj said:
7 years ago
It Generally cured in air.
Mith said:
7 years ago
What is curing period for cement mortar?
Saugat Oli said:
7 years ago
I think D is the correct answer.
Hemant kumar said:
6 years ago
Right answer. Thanks all for explaining.
Arjun talwar said:
6 years ago
I think D is the correct answer.
Ram nehra said:
5 years ago
I think D is the correct answer.
Muhammad Nadeem said:
4 years ago
E is the correct option.
GirischD said:
3 years ago
In the case of lime concrete, the curing starts after 24 hours and is done for a minimum of 7 days period.
Hence, the masonry works can only be done on the foundation after a minimum of 7 days.
Hence, the masonry works can only be done on the foundation after a minimum of 7 days.
Ak mali said:
3 years ago
In the case of lime concrete, the curing starts after 24 hours and is done for a minimum of 7 days period. Hence, the masonry works can only be done on the foundation after a minimum of 7 days.
In the case of cement concrete, the curing starts after 3-48 hours to ensure the initial and final setting time of concrete.
The curing is done for a minimum period of 7 days or up to the period at which the strength of concrete becomes 70% of the characterized strength.
In the case of cement concrete, the curing starts after 3-48 hours to ensure the initial and final setting time of concrete.
The curing is done for a minimum period of 7 days or up to the period at which the strength of concrete becomes 70% of the characterized strength.