Discussion :: Building Materials - Section 4 (Q.No.13)
Anuj said: (Jan 13, 2018) | |
There are 3 types of hydraulic lime. But, acc to IS code class A lime's (eminent hydraulic lime) initial setting time is 2 hrs. |
Ankush Choukade said: (Jan 21, 2018) | |
Yes you are right. Correct answer is 60 min. |
Prasanth said: (Jun 13, 2019) | |
Please explain the answer in detail. |
Arpitdubey said: (Dec 11, 2020) | |
Intial setting time is 2 hrs and final setting time is 48hrs. |
Muhammad Hashim said: (Jan 29, 2022) | |
Lime Pozolana 120 min. Hydraulic Lime 120 min. Asbestos cement 90 min. |