Civil Engineering - Building Construction - Discussion

39. 

Pick up the correct statement from the following :

[A]. the pile driven in sand is called sand pile
[B]. the drilled hole filled with sand is called sand pile
[C]. the sand piles are used for bearing purposes
[D]. None of these.

Answer: Option A

Explanation:

No answer description available for this question.

Bala said: (Oct 22, 2016)  
I think the answer is b) the drilled hole filled with sand is called sand pile.

Baloch said: (Oct 28, 2016)  
Sand piles are sand compacted piles,

After boring the ground, filled with sand and then compacted, B] resembles correct answer.

Baloch said: (Jan 17, 2017)  
B is the correct answer.

Chaya said: (Feb 15, 2017)  
B is the correct answer. I too agree.

Panchal Ekta said: (Aug 7, 2017)  
B is the correct answer.

YUG said: (Oct 26, 2017)  
B is the correct answer.

Apcivilian said: (Dec 17, 2017)  
B is absolutely right. I also agree.

Hayat said: (Sep 29, 2019)  
B is the correct answer.

Imtiaz said: (Feb 15, 2020)  
B the correct answer.

Faisal said: (Aug 24, 2020)  
Agree, it should be option B.

Behroz Ali said: (Aug 24, 2021)  
The correct answer is B. I too agree.