Civil Engineering - Building Construction
Exercise : Building Construction - Section 5
16.
A pre-stressed concrete pile is
17.
The highest line of sloping roof, where two oposite slopes meet, is known as
18.
The vertical sides of a door and window openings provided in a wall, are known as
19.
The piece of a brick cut along the centre of width in such a way that its length is equal to that of full brick, is called
20.
A stair should not have pitch more than