The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to
42.
The compaction of concrete in the drilled pile hole is done by compressed air in the case of
43.
The opening provided in sloping roof with its top parallel to the roof surface, is called
44.
The type of ashlar masonry in which stones are finely chisel dressed and thickness of joints does not exceed 3 mm, is
45.
The lower half portion between crown and skew back of the arch, is called