Civil Engineering - Building Construction
Exercise : Building Construction - Section 1
26.
The entrained concrete is used in lining walls and roofs for making
27.
The pile which is provided with a bulb filled with concrete at its lower end, is known as
28.
In case of multi-storeyed buildings, the forms to be removed first are
29.
For providing a raft foundation, the following activities are involved
The correct sequence is
- ramming the foundation bed
- excavation of the soil upto required depth
- laying the reinforcement over the foundation bed
- curing the cement concrete placed over reinforcement
- pouring the cement concrete over the reinforcement.
The correct sequence is
30.
The maximum permissible deflection of a timber beam supporting a roof, is