Chemical Engineering - Process Equipment and Plant Design - Discussion
Discussion Forum : Process Equipment and Plant Design - Section 4 (Q.No. 15)
15.
In a rotary drier, the average retention time of solid is(where Z = length of the drier, metres ρ = apparent solid density, kg/m3 L = flow rate of dry solids, kg/see. m2 drier cross-section H = hold up of solid.)