43.
Chemical engineering plant cost index is used for finding the present cost of a particular chemical plant, if the cost of similar plant at some time in the past is known.
The present cost of the plant = original cost x
The most major component of this cost index is
The present cost of the plant = original cost x

The most major component of this cost index is
Discussion: