Chemical Engineering - Chemical Engineering Basics - Discussion

Discussion Forum : Chemical Engineering Basics - Section 4 (Q.No. 46)
46.
On-off control
fully opens the final control element, when the measured variable is below the set point.
fully closes the final control element, when the measured variable is above the set point.
is a two position control (fully open or fully closed) control adequate to control a process with slow reaction and minimum dead time or transfer lag.
none of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
Be the first person to comment on this question !

Post your comments here:

Your comments will be displayed after verification.