9.
A does 80% of a work in 20 days. He then calls in B and they together finish the remaining work in 3 days. How long B alone would take to do the whole work?
23 days
37 days
371/2
40 days
Answer: Option
Explanation:

Whole work is done by A in ( 20 x 5 ) = 25 days.
4

Now, ( 1 - 4 ) i.e., 1 work is done by A and B in 3 days.
5 5

Whole work will be done by A and B in (3 x 5) = 15 days.

A's 1 day's work = 1 , (A + B)'s 1 day's work = 1 .
25 15

Therefore B's 1 day's work = ( 1 - 1 ) = 4 = 2 .
15 25 150 75

So, B alone would do the work in 75 = 37 1 days.
2 2

Discussion:
164 comments Page 9 of 17.

Vishnu said:   8 years ago
Very simple,

A's 1 day work = (0.8/20).
(a+b)'s 1 day work = (0.2/3).

So, b's work = (0.2/3) - (0.8/20).
= 2/75.

Therefore days taken by B = 75/2 = 37 1/2.

P srinivas Rao said:   8 years ago
A 80, of work = 80/100= 4/5 = 1/5.
A 100, of whole work = 100/80*20=25.
remaining work (A+B)= 1/5= 3days.
(A+B) total work= 3*5/1= 15 days.
B whole work= 25*15/10=37.5 answer.

Sivapriya said:   10 years ago
Hai guys I have one doubt. Will you please explain me. Geore do 3/5th work in 9 days. He then call paul and finish in 4 days. How long paul take to work by himself?

Inna said:   10 years ago
A's work 80% --- 20.

100% --- 25 (A).

A + B work (the remaining work means) 20% --- 3.

100% --- 15 (A+B).

(A+B) - A = B.

= 25*15/10 = 75/2 = 37*1/2.

Keshav T said:   3 years ago
A = 20/(80/100)=20/(4/5)
A = 20*5/4.
A = 25 days i.e 1/25 days.
1-(4/5 )work is done = 1/5.
A+B = 1/15.
1/15 - 1/25 = 2/75.
75/2 i e 37(1/2) days.
(21)

Namrata Gujar said:   4 years ago
A=80%
Remain 100 - 80 = 20%.

A = (1/20) * (80/100) = 1/25.
A+b = (1/3)+(20/100) = 1/15.
A+b.
(1/25) + b = 1/15.
B = 2/75,
B = 75/2,
B = 37(1/2).
(1)

Srini said:   1 decade ago
A's 20% work in 5 days and A+B'in 3 days,

So B's 20 work in (1/3 - 1/5) = 2/15 i.e 15/2.

So B's 100% work in (15/2)*5 = 75/2 = 37.5 days.

VIKRAM SIHAG said:   1 decade ago
Efficeny of A+B = 20/3 = 6.66.
EFFICENCY OF A = 80/20 = 4.00.

THEN EFFICENCY OF B = 6.66-4.00 = 2.66.

DAYS TAKEN BY B = 100/2.66 = 37.5.

Gaurav gupta said:   1 decade ago
Here is the solution to get total work days of A.

80% work can done in 20 days.

So 1% can be done in (20/80%) = (20/80)*100 = 25 days.

Milan said:   4 years ago
Here;
20 is 80 %,
25 is 100%,
A+B = 3 days this is 20 %.
20% * 5 = 3 * 5 for 100% work,
B= A+B- A.
B=1/15- 1/25,
B = 2/ 75 = 37.5.