Mechanical Engineering - Production Engineering - Discussion

Discussion Forum : Production Engineering - Section 5 (Q.No. 44)
44.
Which of the following operation is first performed?
Spot facing
Boring
Tapping
Drilling
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
40 comments Page 4 of 4.

Abdul said:   9 years ago
Drilling > Boring > Tapping > Spot facing.

It is the correct sequence.

Sai kiran said:   10 years ago
Drilling is the correct answer because with out drilling we cannot make boring. So the sequence is:

1) Drilling.
2) Boring.
3) Tapping
4) Spot facing.

Takkuu said:   10 years ago
Spot facing is the answer. Because between 4 options given we will first do spot facing. Then drilling the boring and then taping.

Neeraj said:   10 years ago
Yes drilling is first.

Sononeyogesh said:   1 decade ago
The correct sequence:

1) Drilling.
2) Boring.
3) Tapping.
4) Spot facing.

Syed Khaja said:   1 decade ago
Spot facing comes sometimes before and sometimes after drilling and boring only. So not first.

But the next definate process should be drilling because if no drilling how boring will come.

Yogesh said:   1 decade ago
A) Drilling.
B) Boring.
C) Tapping.
D) Spot facing.

Gaurav said:   1 decade ago
Wrong answer.

Because in practically the sequence is:
A) Spot facing
B) Drilling
C) Boring
D) Tapping

Akki said:   1 decade ago
How can boring be done before drilling? while boring is to enlarge the hole.

Aabid said:   1 decade ago
It must be drilling first. Drilling is originating a hole and boring is enlarging the hole previously drilled in drilling.


Post your comments here:

Your comments will be displayed after verification.