Civil Engineering - Water Resources Engineering
Exercise : Water Resources Engineering - Section 2
- Water Resources Engineering - Section 1
- Water Resources Engineering - Section 2
- Water Resources Engineering - Section 3
46.
For high flood estimates the average value of the constant C in Dicken's formula Q = CA3/4, is
47.
Pettis formula Q = C (P.B)5/4 cumecs, is based upon
48.
Boston society of Civil Engineer's formula
in cumecs/square km is based upon

49.
For predicting floods of a given frequency, the best reliable method is
50.
The earthen embankments constructed parallel to the river banks at some suitable distance for flood control, are known as
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers