Civil Engineering - Surveying - Discussion
Discussion Forum : Surveying - Section 1 (Q.No. 38)
38.
Offsets are measured with an accuracy of 1 in 40. If the point on the paper from both sources of error (due to angular and measurement errors) is not to exceed 0.05 cm on a scale of 1 cm = 20 m, the maximum length of offset should be limited to
Discussion:
22 comments Page 3 of 3.
Ihab said:
10 years ago
Why 1.414?
JAY PANCHAL said:
8 years ago
Why 1.414?
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers