Civil Engineering - Highway Engineering - Discussion

Discussion Forum : Highway Engineering - Section 3 (Q.No. 30)
30.
The wall constructed for the stability of a back filling portion of a road on the down hill side, is known as
retaining wall
breast wall
parapet wall
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
15 comments Page 2 of 2.

Annie said:   9 years ago
Breast is correct answer.

Pramit said:   5 years ago
Right, Thanks @Garry.
(1)

Henchoi Phom said:   5 years ago
Thank you @Akshay.

Augustine Ar-ef said:   7 years ago
Thankyou @Akshay.

Pawan said:   6 years ago
Thanks @Garry.


Post your comments here:

Your comments will be displayed after verification.