Civil Engineering - Advanced Surveying
Exercise : Advanced Surveying - Section 4
- Advanced Surveying - Section 1
- Advanced Surveying - Section 2
- Advanced Surveying - Section 3
- Advanced Surveying - Section 4
26.
The declination and right ascension of the sun becomes 23° 27' S and 270° respectively on
27.
The product of the distances of plumb point and horizon point of a vertical photograph from its principal point, is
28.
The principal line is the line joining the principal point and
29.
Longitudes are measured from 0° to
30.
If the distance between the projectors is altered by a movement along X-axis of one projector,
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers