Civil Engineering - Advanced Surveying
Exercise : Advanced Surveying - Section 1
- Advanced Surveying - Section 1
- Advanced Surveying - Section 2
- Advanced Surveying - Section 3
- Advanced Surveying - Section 4
6.
The shortest distance between two places measured along the surface of the earth, is
7.
The correction for parallax, is
8.
The angle between the plane of the equator and the plane of the ecliptic, is known as obliquity of the ecliptic and its value is
9.
Systematic errors
10.
Perspective centre relates to
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers