Chemical Engineering - Process Equipment and Plant Design
Exercise : Process Equipment and Plant Design - Section 4
- Process Equipment and Plant Design - Section 1
- Process Equipment and Plant Design - Section 2
- Process Equipment and Plant Design - Section 3
- Process Equipment and Plant Design - Section 4
- Process Equipment and Plant Design - Section 5
- Process Equipment and Plant Design - Section 6
- Process Equipment and Plant Design - Section 7
- Process Equipment and Plant Design - Section 8
41.
Hazards associated with the relief valve leakage for extremely hazardous material storage can be taken care of by providing
42.
Minimum baffle spacing recommended in a shell and tube heat exchanger is equal to
43.
__________ liquor is best handled in a long tube vertical evaporator.
44.
Theoretically calculated diameter of the stripping section of the continuous rectification column is __________ that of the enriching section.
45.
Hold up of material in a operating rotary drier is in the range of
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers