Why Technical Drawing Architectural Working Drawings?

In this section you can learn and practice Technical Drawing Questions based on "Architectural Working Drawings" and improve your skills in order to face the interview, competitive examination and various entrance test (CAT, GATE, GRE, MAT, Bank Exam, Railway Exam etc.) with full confidence.

Where can I get Technical Drawing Architectural Working Drawings questions and answers with explanation?

IndiaBIX provides you lots of fully solved Technical Drawing (Architectural Working Drawings) questions and answers with Explanation. Solved examples with detailed answer description, explanation are given and it would be easy to understand. All students, freshers can download Technical Drawing Architectural Working Drawings quiz questions with answers as PDF files and eBooks.

Where can I get Technical Drawing Architectural Working Drawings Interview Questions and Answers (objective type, multiple choice)?

Here you can find objective type Technical Drawing Architectural Working Drawings questions and answers for interview and entrance examination. Multiple choice and true or false type questions are also provided.

How to solve Technical Drawing Architectural Working Drawings problems?

You can easily solve all kind of Technical Drawing questions based on Architectural Working Drawings by practicing the objective type exercises given below, also get shortcut methods to solve Technical Drawing Architectural Working Drawings problems.

Exercise :: Architectural Working Drawings - General Questions

1. 

The building construction industry relies on sets of ________ drawings to construct homes and commercial buildings.

A. mechanical
B. isometric
C. architectural working
D. all of the above

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

2. 

The text height for room names should be set to ________for a drawing that will be plotted to a scale of ¼" = 1'-0".

A. 4"
B. 5"
C. 6"
D. 8"

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

3. 

The architectural drafter usually begins a set of working drawings by creating the ________ plan first.

A. foundation
B. floor plan
C. elevations
D. building section

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

4. 

Once the architect has finalized the house plans with the client any changes to the design requested by the client will require a ________.

A. change order
B. modification slip
C. whole new set of drawings
D. none of the above

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

5. 

The foundation contractor will work with the following architectural plans.

A. foundation
B. site plan
C. floor plan
D. all of the above

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.