Technical Drawing Test 10
Time Left: 00:30:00
Online Test > Online Technical Drawing Test > Technical Drawing Test 10 (Mock Test)
Loading Test...
Instruction:
Total number of questions : 20 .
Time alloted : 30 minutes.
Each question carry 1 mark, no negative marks.
1.
The organized and orderly approach to solving problems is known as the:
2.
Scale is stated as a ratio of the number of drawing units to the number of actual units.
3.
The top, front, and bottom views align in this manner:
4.
The section view drawing in which one fourth of an object has been marked for removal is known as a ________ section.
5.
The center line of a hidden cylinder feature appearing in the front view should line up with the center mark in the corresponding circle which appears in the auxiliary view.
6.
When a finished part is measured, it may vary slightly from the exact dimension specified.
7.
Specific tolerances are based on the part's function and fit.
8.
A machine pin is a mechanical device designed to store energy when deflected and to return the equivalent amount of energy when released.
9.
To be useful, drawings must be stored electronically in a manner that satisfies the requirements for a static snapshot of the design at the time of release.
10.
In oblique projections, one of the object's principal faces is parallel to the plane of projection.
11.
These are accurately drawn maps of cities and towns showing property lines and other features that control property ownership:
12.
PVC joints are made with flared joints or solder joints.
13.
Some of the standard AutoCAD text styles used in architectural drawings includes ________.
14.
There should be a visible gap between the wall and the ________ line.
15.
Isometric drawings are often used by ________ to help illustrate complex designs.
16.
The Offset command can be used on vertical lines but not on horizontal lines.
17.
When inserting a block into a drawing the drafter can easily change the scale to match a particular scale factor for the drawing.
18.
Mechanical drafters can revise any drawing at any time without tracking those changes.
19.
BOM stands for Bill of Materials.
20.
The symbols used on electrical plans represent the standard equipment used in homes and commercial buildings.
Submit your test now to view the Results and Statistics with answer explanation.
Note:
Click the 'Submit Test' button given in the bottom of this page to Submit your answers.
Test will be submitted automatically if the time expired.
Don't refresh the page.
Marks : [XX/XX]
Total number of questions
:
[TQ]
Number of answered questions
:
[AQ]
Number of unanswered questions
:
[UQ]