Mechanical Engineering - Industrial Engineering and Production Management

Why Mechanical Engineering Industrial Engineering and Production Management?

In this section you can learn and practice Mechanical Engineering Questions based on "Industrial Engineering and Production Management" and improve your skills in order to face the interview, competitive examination and various entrance test (CAT, GATE, GRE, MAT, Bank Exam, Railway Exam etc.) with full confidence.

Where can I get Mechanical Engineering Industrial Engineering and Production Management questions and answers with explanation?

IndiaBIX provides you lots of fully solved Mechanical Engineering (Industrial Engineering and Production Management) questions and answers with Explanation. Solved examples with detailed answer description, explanation are given and it would be easy to understand. All students, freshers can download Mechanical Engineering Industrial Engineering and Production Management quiz questions with answers as PDF files and eBooks.

Where can I get Mechanical Engineering Industrial Engineering and Production Management Interview Questions and Answers (objective type, multiple choice)?

Here you can find objective type Mechanical Engineering Industrial Engineering and Production Management questions and answers for interview and entrance examination. Multiple choice and true or false type questions are also provided.

How to solve Mechanical Engineering Industrial Engineering and Production Management problems?

You can easily solve all kind of Mechanical Engineering questions based on Industrial Engineering and Production Management by practicing the objective type exercises given below, also get shortcut methods to solve Mechanical Engineering Industrial Engineering and Production Management problems.

Exercise :: Industrial Engineering and Production Management - Section 1

1. 

The aim of value engineering is to

A. find the depreciation value of a machine
B. determine the selling price of a product
C. minimise the cost without change in quality of the product
D. all of the above

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

2. 

In time study, the rating factor is applied to determine

A. standard time of a job
B. merit rating of the worker
C. fixation of incentive rate
D. normal time of a worker

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

3. 

Gantt chart is used for

A. inventory control
B. material handling
C. production schedule
D. machine repair schedules

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

4. 

The main object of scientific layout is

A. to produce better quality of product
B. to utilise maximum floor area
C. to minimise production delays
D. all of these

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

5. 

The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)

A.
B.
C.
D.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

1 2 3 4 5 6 7 8 9 10 Next »